Filtering 110 NIST 800-171 Gaps Against 32 CFR 170.21 POA&M Rules in the Browser
Unlike FedRAMP, the DoD doesn't mandate one official Excel file format for a NIST SP 800-171 or CMMC Level 2 Plan of Action and Milestones (POA&M). What it does enforce strictly under 32 CFR 170.21 is which unmet control
Unlike FedRAMP, the DoD doesn't mandate one official Excel file format for a NIST SP 800-171 or CMMC Level 2 Plan of Action and Milestones (POA&M). What it does enforce strictly under 32 CFR 170.21 is which unmet controls are legally allowed on that spreadsheet at all.
If you're building or using an internal tracker, five statutory rules decide whether a gap list passes a Conditional Level 2 check:
- Today's score ratio >= 0.8: With 110 controls, your score at assessment must be 88 or higher. Putting an item on a POA&M doesn't restore its points today (32 CFR 170.24(c)(2)(i)(B)(6)).
-
1-point cap (with one exception): Only 1-point controls qualify, plus
SC.L2-3.13.11at 3 points when non-FIPS encryption is already deployed. Every other 5-point and 3-point control must be closed beforehand. -
Six hard exclusions:
AC.L2-3.1.20,AC.L2-3.1.22,CA.L2-3.12.4,PE.L2-3.10.3,PE.L2-3.10.4, andPE.L2-3.10.5can never sit on a Conditional Level 2 POA&M — even though five of them only carry 1 point. - Full coverage: Every open NOT MET requirement needs a tracked row with weakness description, milestones, owner, and resource estimate.
- 180-day closeout clock: Closeout verification must finish within 180 calendar days or Conditional Status expires.
How many controls actually qualify?
Out of 110 NIST SP 800-171 Rev. 2 controls:
- 51 carry 1 point, minus the 5 excluded Level 1 controls = 46 eligible 1-point controls
- Plus
3.13.11in partial status = 47 controls total
Because small defense shops often don't want to paste their security gaps into a cloud SaaS account just to build a tracker, we implemented the 47-control filter directly in browser localStorage with blank Excel/CSV downloads and one-click export of open gaps at https://cmmcpal.com/poam/.
It's meant for baseline planning and small-team tracking — once a company has 20+ staff and needs continuous cloud evidence collection across GCC High or AWS GovCloud, a dedicated GRC platform makes more sense.
Originally published by Dev.to Security. Aggregated on AIWithGhost for educational purposes — full credit and traffic to the original publisher.