Canary deploys with automatic rollback
Originally published on gregale.dev. I build Gregale, so read this as a vendor's page; every competitor figure links to that vendor's own docs. Gregale is a backend platform where every production release is a canary by
Originally published on gregale.dev. I build Gregale, so read this as a vendor's page; every competitor figure links to that vendor's own docs.
Gregale is a backend platform where every production release is a canary by default. When you deploy a new version of an app that already serves traffic, Gregale sends 1% of requests to it first, then 10%, 50% and 100%, moving up only while the new version is as healthy as the one it replaces. If it returns more 5xx errors, crash-loops, or gets slower after it reaches 100%, Gregale rolls it back on its own and records why. There is no pipeline, service mesh, load balancer or monitoring tool to set up: it is how gregale deploy works out of the box, on every plan. Progressive rollouts are in beta.
How a release rolls out
- 1% โ 10% โ 50% โ 100%. The new version gets a growing share of real traffic. The previous version keeps serving the rest.
- Each stage advances on evidence, not on a timer. A stage lasts at least a minute and moves on once both versions have answered at least 20 requests in it with no 5xx regression, no out-of-memory kills and no liveness restarts. A typical release reaches 100% in 3 to 5 minutes.
-
Quiet apps still get a real comparison. If an app doesn't get enough traffic to compare, Gregale sends
GET /twenty times a minute to both versions while the rollout runs. You can point these probes at up to three routes that matter, such as/healthzor/api/orders. - A watch after 100%. For 30 minutes after a release takes all traffic, Gregale keeps comparing it with the previous release. A clear rise in 5xx errors or in p95 latency rolls it back automatically.
The deploy command follows the rollout live and prints each stage and why it advanced:
Rollout: 10% traffic ยท step 2/4 ยท rolling_out ยท advanced on synthetic probes: this release 0/30 probe 5xx, the current one 0/30
What rolls a release back automatically
| Signal | When Gregale rolls back |
|---|---|
| 5xx errors during the rollout | The new version returns 5xx more often than the version it replaces |
| 5xx errors right after release | In the first 5 minutes of traffic, at least 5 responses are 5xx and they are at least half of the release's requests (checked every 15 seconds) |
| Crash loop | Its liveness probe restarts the new version twice, and more than twice as often as the previous version, even with no traffic |
| Regression after 100% | A clear 5xx or p95 latency regression within 30 minutes of reaching 100% |
A route that was already failing does not count against a release: if the previous version returned the same 5xx for the same method and route in the last 24 hours, it is left out. Old bugs don't block new releases.
Every decision is recorded with its evidence (request, 5xx, probe, latency, out-of-memory and restart counts for both versions). gregale release summary shows it, the API returns it on the deployment, and the rollout.completed and rollout.aborted webhooks carry it.
Commands
gregale deploy # production release: safe rollout by default
gregale deploy --rollout fast # 5% -> 50% -> 100%, a minute each
gregale deploy --rollout immediate # all traffic at once
gregale release canary simulate my-api --canary-preset balanced # preview a ladder against recent traffic
gregale app my-api --release-probe-paths /healthz,/api/orders # what quiet-app probes request
gregale release summary <id> # why the rollout advanced, waited or rolled back
gregale rollback my-api # back to the previous release; no rebuild
Ladders: adaptive (1/10/50/100, the default), aggressive (5/50/100, a minute each), balanced (1/10/50/100, 2 minutes each), slow (1/10/100, 5 minutes each), or your own stages, for example 5@1m,25@5m,100@0s. See Progressive rollouts for every rule.
Safe rollouts apply to production releases of apps that already serve traffic, whether they come from the CLI, the GitHub App, gregale project apply, the API or Terraform. First deploys and pull-request previews go out directly, and worker, job and service apps keep their own rollout behavior.
The rest of the release toolkit
-
Manual rollback in seconds.
gregale rollbackreuses the previous build instead of rebuilding, waits until it actually serves again, and reports how long it took. Every rollback, automatic or manual, has a receipt. -
Rollbacks that include the database. On paid plans,
--restore-databasesrolls back the code and the managed Postgres database together, to the moment before the release's migrations ran. -
Sticky users. Send a
Gregale-Version-Keyheader to keep one user on one version while a rollout runs. -
Dark deploys.
--no-trafficstages a new version beside the live one without sending it any requests. - Approvals, freezes and schedules. Require approvals before a release goes out, freeze releases for a window (or automatically after a rollback), and schedule a release for 02:00. See Release controls.
- In preview: release gates that abort or roll back a release on SLO burn rate, new error groups, a synthetic check, AI call cost or a business metric such as orders per minute; alert rules that hold or roll back a rollout; and, on Pro and Scale, mirroring a share of live requests to a dark version to compare its answers before it serves anyone.
How other platforms compare
| Platform | Percentage canary built in | Automatic rollback on errors | What you set up |
|---|---|---|---|
| Gregale | Yes, on by default for production releases (1% โ 10% โ 50% โ 100%; beta) | Yes: 5xx rate, crash loops, p95 latency | Nothing; optional probe paths |
| Heroku | No. Preboot runs old and new dynos side by side for a few minutes before switching | No; heroku rollback is manual |
Enable preboot per app |
| Render | No. Zero-downtime deploys with health checks | A failed health check keeps the old version live; after that, rollback is one-click or API. Render's own guide builds canaries with Cloudflare traffic weights and an external workflow engine | DNS-level traffic weights, a workflow tool, monitoring |
| Railway | No. Checks a health endpoint before switching | A failed health check aborts the deploy; no rollback on errors after it | Health check path |
| Fly.io | Partly. --strategy canary boots one new Machine, health-checks it, then does a rolling restart |
Health checks gate the deploy; no error-rate rollback after it | Health checks in fly.toml
|
| Google Cloud Run | Manual percentage split between revisions; Cloud Deploy adds canary phases | Rollback is a manual traffic shift, or your own pipeline logic | A Cloud Deploy pipeline and verify jobs, or scripts |
| AWS (ECS/Lambda + CodeDeploy) | Yes, canary and linear deployment configurations | Yes, on CloudWatch alarms you define | CodeDeploy application, deployment groups, alarms |
Checked against each vendor's public documentation on November 24, 2026: Heroku preboot, Heroku releases, Render canary guide, Railway feature request, Fly.io deploys, Cloud Run traffic migration, Cloud Deploy canary, AWS CodeDeploy deployment configurations.
Pricing
Canary rollouts and automatic rollback are included on every Gregale plan, including Free. Gregale's plans are Free, Hobby, Pro and Scale; see Gregale pricing. The quiet-app probes are ordinary requests and count as running time: about 0.09 GB-RAM-hours for a quiet rollout of a 256 MB app.
FAQ
Do I need to change my app to get canary deploys on Gregale?
No. Any HTTP app deployed with gregale deploy gets them. For better signal on a quiet app, name up to three cheap, read-only probe paths that answer without a login.
What happens to users who hit the new version before a rollback?
The new version keeps serving until the previous one is ready again, so there is no window with nothing serving. Send a Gregale-Version-Key header if a user must stay on one version for a whole session.
Can I turn it off for an urgent hotfix?
Yes: gregale deploy --rollout immediate for one deploy, or gregale app my-api --release-policy immediate for every deploy. --rollback-on-5xx=false turns off the automatic rollback.
What about database migrations?
Rolling back code does not undo a migration. Rolling back to the release that was serving when the migration ran needs nothing extra. A rollback that would put older code on a newer schema is refused unless you acknowledge it, and automatic rollbacks never cross a migration: they keep the current release serving and tell you. On paid plans, gregale rollback --restore-databases also restores the managed Postgres database to the moment before the migration, as a new database, and moves the app to it.
Does it work with GitHub pushes and Terraform?
Yes. Production releases from the GitHub App, gregale project apply, the API and Terraform use the same safe rollout.
Originally published by Dev.to WebDev. Aggregated on AIWithGhost for educational purposes โ full credit and traffic to the original publisher.